Bales of cellulose await loading into the hopper
|
|
|
The bay window with all the surrounding maple paneling completed
|
|
|
The bedroom has two closets, each paneled with maple. We used the maple with the most defects for this job.
|
|
|
The completed paneling in the bedroom
|
|
|
Another view of the completed paneling in the bedroom
|
|
|
The cherry paneling had to be scribed where it met with the maple ceiling, since the maple ceiling was warped and cupped due to moisture damage
|
|
|
A view of the bedroom closet with the new canister lights installed on the ceiling above
|
|
|
The first flooring was laid near the chimney in the kitchen
|
|
|
Leslie inspects the hickory flooring
|
|
|
New canister lights in the great room
|
|
|
New canister lights in the bedroom
|
|
|
The toilet closet was paneled with cherry scraps down low and maple up higher
|
|
|
The cherry paneling in the bedroom was scribed around each oak rafter
|
|
|
Up close and personel with the cherry paneling in the bedroom
|
|
|
The completed insulation job in the bathroom. Cellulose was blown into the various cavities in the exterior wall.
|
|
|
Careful work by Skip the electrician
|
|
|
The first window extension jamb and sill installation in the bathroom
|
|
|
Another window with a completed extension jamb
|
|
|
The extension jamb on the triangular window
|
|
|
The hickory floor was carefully scribed around the stonework of the chimney
|
|
|
The chumney hearth showing the careful scribe work on the flooring
|
|
|
Closeup of the floor around the hearth
|
|
|
I installed cherry flooring on the ceiling above the bedroom closet; this flooring was extra from our house construction 15 years ago
|
|
|
More flooring around the side of the chimney
|
|
|
More flooring around the side of the chimney
|
|
|
More flooring around the side of the chimney
|
|
|
Side of the great room from the loft
|
|
|
The great room and chimney with the scaffolding
|
|
|
Green board installed in the shower
|
|
|
The interior bedroom wall was insulated, both for sound proofing and to shut off part of the house in the winter
|
|
|
Johnny finishes the final corner of flooring in the bedroom
|
|
|
Katey helps break up the cellulose bales as they enter the hopper
|
|
|
The bathroom wall prominently displays a natural knot in the maple
|
|
|
The maple flooring in the loft, partially completed
|
|
|
Lucie sands the front door; for some reason, the door was delivered with black mold on the lower half
|
|
|
The paneling (maple) and trip (cedar) in the dressing room, all from scraps left over from our basement project
|
|
|
The wall paneling was carefully installed around the braces of the frame
|
|
|
Paneling in the bathroom, partially complete
|
|
|
Paneling in the hallway and utility area
|
|
|
Completed paneling in the bathroom, wide angle view
|
|
|
Paneling in-progress in the great room
|
|
|
Paneling in-progress in the great room
|
|
|
Paneling in the loft just after it was completed
|
|
|
Paneling in the loft just after it was completed
|
|
|
The panels in the peak of the roof needed to be assembled in advance, then slide up behind the post-and-beam structure using a sledge hammer
|
|
|
Schelly emerges from the Hut just after a session with the insulation blower
|
|
|
Schelly cuts flooring on the chop saw
|
|
|
A nasty job, Schelly blows insulation into the bathroom wall
|
|
|
The bedroom before the closet was paneled
|
|
|
The wood stove prior to installation
|
|
|
The wood stove with its first fire
|
|
|
The wood stove and pipe, just after installation
|
|
|
Fisheye view of the toilet closet
|
|
|
The first window to be completed with its trim, in this case, walnut wood
|
|
|
Fisheye view of the bedroom and closets
|
|
|
Fisheye view of the bedroom, ready for the floor sander
|
|
|
Fisheye view of the bedroom, ready for the floor sander
|
|
|
Great room cleared of tools and ready for the floor sander
|
|
|
Great room cleared of tools and ready for the floor sander
|
|
|
The great room with the doors stacked against the wall
|
|
|
Looking at the bay window from the loft
|
|
|
Bathroom hallway
|
|
|
The chimney and gear room
|